Project Description

The project includes 3 stations and 7 intervals. The gross area is 25,940㎡. The interval tunnels, constructed with shield method, and single circular tunnel structure, buried depth of 17.4~23.3m. The overall length of single line is 10,938m. This project was commenced on March 1, 2014, and scheduled to complete on December 31, 2016.